01Technical requests into structured records
Extract an affected system, part or project reference from approved request channels and show any missing information. Keep source files and messages attached to the draft. Route ambiguous requests to a coordinator who can confirm the intended work before a task reaches engineering or operations.
02Supplier and project document checks
Compare proposed order references, dates and quantities with the project's approved records. Flag duplicate attachments and incompatible item references. The workflow should distinguish document completeness from technical acceptance, leaving product and quality judgments with the qualified people who own them.
03Knowledge retrieval with access boundaries
Prepare draft answers from an approved collection while preserving source passages, versions and permissions. Separate information suitable for broad internal use from restricted materials. Evaluate questions with insufficient evidence so the system can show its limitations instead of filling gaps with plausible language.
04A recoverable integration path
Use supported interfaces and explicit record identifiers to connect systems. Design safe retries, duplicate checks and a visible failed-job queue. Before expanding the workflow, establish who investigates a failed run and how staff resume work when a connection or source record is unavailable.